Three systems. Drawn at once.
Three systems.
Drawn at once.
THE SECTION IS THE LOGO
Designing
what you don't see
Exactly what is needed, exactly where it is needed.
The SEDS mark is these three sections.
Air, power and water, by one team.
Designs in 15 Months
SEDS / 2025.08–2026.10
Years of MEP Design
SEDS / Since 2016
Prefectures
SOWA Group / Hokkaido to Kumamoto
Projects Built
SOWA Group / 2023–2026
From the spaces and uses drawn by the architect or designer, we read what the building services must do.
Room by room, we calculate the capacity needed for power, water supply, drainage, air conditioning, ventilation and gas.
Keeping the whole building's capacity in view, we find routes for pipes and wiring through limited space: wall thickness, the depth above the ceiling.
Can it be inspected and replaced later? Looking at life-cycle cost, we choose the best from many realistic options.
Sound knowledge and the drive to solve problems. Deep experience and a long track record.
From these, we arrive at the best building services design.
Three systems.
Drawn at once.
3 Companies.1 Team.