Frequently asked
questions.よくあるご質問。
FAQ
- Which systems do you design?
- HVAC and ventilation, plumbing and gas, and electrical systems including fire alarms. One team designs all three at the same time.
- Which documents do you produce?
- Heat load, ventilation and electrical capacity calculations, detailed design drawings, building permit documents and as-built drawings.
- Can I ask for design only?
- Yes. We take on design only, work alongside architects’ offices, or handle design and build together.
- How long does design take?
- Usually 3 to 7 days until the design is final. It depends on scale and scope, so please ask.
- Can I ask without drawings?
- Yes. We accept PDF, CAD, hand sketches and photos. You can also ask at the concept stage, before any drawings exist.
- Can I see the result in advance?
- If needed, we model the piping, frames and equipment in 3D CAD and render them into images.
- Do you take on renovations and relocations?
- Yes. Our work includes HVAC retrofits for schools, a headquarters annex and office renovations. See the list of works.
- Which areas do you cover?
- We are based in Minami-Aoyama, Minato-ku, Tokyo. As the SOWA Group, we have built in 20 prefectures, from Hokkaido to Kumamoto.
- Can I write in English or Vietnamese?
- Yes. English, Vietnamese and Japanese are all welcome.
- How do I make a request?
- Enter your name, email and request in the form, attach drawings and send. You’ll get a reference number and a confirmation email. Details are on the Contact page.
01
02
03
04
05
06
07
08
09
10
info@seds.jp